Highway Construction:
4 – lanning of National highway no: 516F from Samarlakota to Achampeta Junction (from km. 0.000 to Km. 12.250) as a part of Kakinada port to NH-16 connectivity in the State of Andhra Pradesh on EPC mode under Bharatmala Pariyojana” with a Project Cost of INR. 408 Cr and having order value of 40% of Project Cost.
4 – Laning of Ghaghra Bridge to Varanasi Section of NH-233 (Package-III) in Uttar Pradesh under NHDP Phase-IV on EPC Mode, from Km 240.340 to Km 299.350 (Gossai Bazar Bypass to Varanasi) – Approx. 16 Km with a Project Cost of INR. 300 Cr and having order value of 100% of Project Cost.
Highway Maintenance:
• NH-56 Package-I: Sultanpur to Varanasi Section (Km 134.700 to Km 209.230) – Approx. 75 Km
• NH-56 Package-II: Sultanpur to Varanasi Section (Km 209.230 to Km 272.590) – Approx. 63 Km
• NH-233 Package-III: Azamgarh to Varanasi Section (Km 180.420 to Km 240.340) – Approx. 60 Km
• NH-233 Package-IV: Azamgarh to Varanasi Section (Km 240.340 to Km 263.230 & Km 279.400 to Km 299.350) – Approx. 43 Km
All having a maintenance cost value about INR. 250 Cr for next two years.